Client | Jeff Fuller, AIA, LEED, Associate, Vice Principal gkkworks/Cannon Design (949) 250-1500 jfuller@cannondesign.com
PBS provided customary Mechanical, Electrical, Plumbing, and Low-Voltage Engineering Services as outlined in Article No. 4 of AIA Document No. C401 (2017 edition). The conversion of the existing math and Science Building “C” into eleven (11) classrooms, a staff lounge, and four (4) multi-gang restrooms. The existing building square footage is 18,000.