Banning Senior High School HVAC

Wilmington, California

Total Construction Cost | $15 Million

Client | Nader Peyman, PE, CEM, LEED AP
Los Angeles Unified School District
(213) 241-0522
npeyman@lausd.net

PBS provided Architectural/Engineering services to replace the deteriorated Heating, Ventilation and Air Conditioning equipment serving the Multipurpose Building ā€œCā€ (007DOT), Shop Building No. 1 (006COG) and Shop Building No. 3 (010COT); Replace Cooling Tower and Chiller at Shop Building No. 3 (010COT). The HVAC system replacement includes 200 Ton Chiller, 700 Ton Cooling Tower, Chilled Water Pumps, 8 million BTU Boiler (4 Boiler of 2 Million Btu/ Hr Capacity, Low NOX, High Efficiency and AQMD Approved), 3 Hot water Pumps, Water treatment (Air separator, Chemical Pot Feeder) and Controls replacement.